Chemical Bund

  • Chemical-Bund-scaled

    Acrylicon Chemical Bund System is the optimum chemical bund and tanking solution providing a seamless finish. With its unique 94 newton strength and 2-hour cure time Bunds can be completed and cured in 1 day with a 10-year warranty, we have recently completed a number of chemical bunding projects including the following:

    • Bosch and Lombe Pharma Waterford.
    • Dr Pepper Drinks production Kildare.
    • Nelipak Healhcare Packaging Derry.
    • Dawn Foods Queally Group Naas.
    • Moy Park Foods Dungannon.
    • Amazon Datacentre Dublin.
    Chemical-bund-2
    Chemical-bund-3

    Acrylicon primer, body and seal coat resins are transparent, solventfree, medium viscosity and non-toxic when cured. Acrylicon Bodycoat 1061 SW is used to obtain tough coloured quartz floors. Acrylicon Sealer is used as a colourless, wear resistant seal coat. The curing time is about 1 hour at 20°C/68°F (ambient). The lowest application temperature (substrate and material) is 5°C/41°F. AcryliCon can also provide solutions for installations at temperatures down to -25°C /-13°F.