Commercial Kitchen at the D Hotel, Drogheda, County Louth

Project Details

  • Category :
  • Date realised :07/01/2013

AcryliCon have just installed 115 m2 with coving at the D Hotel Drogheda County Louth. The floor was again installed to a very tight time-frame of 3 days which included the removal of the old floor. The floor was chosen over our competitors due to our high abrasion resistance, Anti-Slip components and warranty.